In an emergency, dial 999, ask for the Police, then Mountain Rescue.

What to tell the operator

Crag rescue

How Woodhead Mountain Rescue Team rescues people from crags and quarries: the skills, training and qualifications of our rope rescue specialists, the kit we use, our techniques and safety margins.

Our area is full of gritstone edges, quarries and steep, wooded crags: Wharncliffe Crags, Snailsden Quarry, and the cloughs of Longdendale and Bleaklow. When someone falls or gets stuck somewhere a stretcher can’t simply be carried, our crag rescue specialists use ropes to reach them, protect them and bring them to safety.

Skills

Close-up of two team members in helmets rigging rope hardware at a fence line
Rigging a rope system at a fence line.
  • Building strong, shared anchors from rock and trees, or from ground stakes where there are none.
  • Rigging lowering and raising systems for a stretcher, a rescuer or both.
  • Edge work: getting people, ropes and a loaded stretcher safely over the edge of a crag and back.
  • Attending a stretcher on steep ground, as the team member who travels with the casualty and looks after them on the way.
  • Pick-offs: reaching a stuck or injured climber and transferring them onto the rescue system.
  • Working safely near an edge in all weathers and at night, protected by fall restraint so no one can fall.
  • Clear, calm communication between the edge, the rope operators and the person in charge of the system.

Training and qualifications

Every hill-going team member learns the basics of working safely on steep ground. Our crag specialists go much further. Our rope work training follows the Mountain Rescue England and Wales training standards, and we train regularly on the crags and quarries in our area, day and night, with realistic stretcher lowers and raises.

Our rope leads have to pass the Rope Rescue Operator Instructor course at Lyon, provided through Mountain Rescue England and Wales (MREW), so they can lead and teach the team’s rope work. It is a four-day course, spread over two weekends. Members who look after our kit also train as fall protection equipment (FPE) inspectors, on a course run by SAR.

Just as important is staying current. Rope skills fade without practice, so we run regular ropework sessions and system checks, and every rescue system is checked by a second person before anyone is put on it.

Four knots we use every time

Rope rescue relies on a handful of knots tied the same way by everyone, so any team member can check anyone else’s work at a glance. These are the four we use most. Animated Knots shows each one being tied, step by step.

Knot animations: Animated Knots, search and rescue knots (opens in a new tab). Learn rope work from a qualified instructor, never from a website alone.

Kit and safety margins in detail

For anyone who wants the technical detail. Tap a heading to open it.

The kit we use

This is the kind of rope rescue equipment we carry, taken from our equipment register. Ready-packed crag kits mean the team can set up quickly at the top of a crag.

KitWhat it’s for
Low-stretch rescue ropes, 11 mm, in 50 m and 100 m lengthsThe main and second lines for lowering and raising. Low stretch means the stretcher doesn’t bounce or sink as load comes on.
Crag kits (red, blue and purple)Ready-packed rigging kits, each with a Rescucender rope grab and prusik loops, so several systems can be built at once.
Rigging plates, pulleys and screwgate karabinersRigging plates spread the load neatly between connections. Pulleys build mechanical advantage for raising. Locking HMS karabiners join it all together.
Prusik loopsFriction hitches that grip the rope: used as rope grabs, back-ups and to capture progress when raising.
Ground stakes and linking strapsMetal stakes driven into the ground and linked together, to make an anchor on open moorland where there is no rock or tree.
Wire anchor ropesSteel-cored anchor slings that won’t be cut by sharp rock or worn on rough edges.
HarnessesSit harnesses for every rope technician.
Rescue triangles (Petzl Thales)A quick-fit harness that can be put on a casualty who is stuck on a ledge or hanging in a harness.
HelmetsClimbing and rescue helmets (Petzl Vertex and Kask) for everyone working on or below a crag.
Stretcher and stretcher lifting kitOur mountain rescue stretcher, with a lifting kit to attach it to the rope system so it can be lowered or raised level or upright.

All of it is paid for by donations. See our vehicles and equipment and the wish list.

Tolerances and safety margins

Rescue systems are built with large margins, because they hold people, not loads. These are the standards commonly used across UK mountain rescue for a two-rope system.

WhatThe standard
Test load200 kg: a stretcher, a casualty and an attendant, with a margin to spare.
Stopping a fallIf the load drops, the system must stop it within 1 metre.
Force on the casualty and kitPeak force kept at or below 12 kN when stopping a fall, and devices that slip to limit force at 6 to 12 kN rather than snap.
Anchor strengthAt least 20 kN at each main anchor point, even if one anchor fails.
Working loadNormal working load on each rope up to about 4 kN.
Rope strength after a fallThe rope must keep more than 80% of its strength after a test fall.
Anchor anglesKeep the angle between anchor legs well under 120°. Beyond that, each leg carries more than the whole load.
Hands-off safetyEvery lowering device must lock if the operator lets go.
Equipment lifeRopes, harnesses and textiles are retired at the end of the manufacturer’s life, typically 10 years from manufacture, or sooner if damaged or after a serious fall.

1 kN is roughly the weight of 100 kg hanging still, so 20 kN is about two tonnes.

Looking after the kit

Every rope, harness, helmet and piece of hardware is logged in our inventory system, with its manufacture date, inspection history and retirement date. After each inspection, kit is sealed and the seal is signed. Equipment is inspected every month, or every three months if its seal has not been broken since the last check. Every inspection is recorded in our inventory system. Inspections are carried out by team members who have completed a fall protection equipment (FPE) inspection course run by SAR, the rescue equipment specialist that supplies much of our rope kit. Kit is also checked before and after every use. Anything that has been dropped, shock-loaded, damaged or has simply reached the end of its life is taken out of service, no matter how good it looks.

Want to see what else we do? Find out about our water rescue team, our medical care and our training.

Techniques

Team members with a stretcher on a rock edge surrounded by trees
Bringing a stretcher across a rock edge.
  • Two tensioned ropes. Wherever possible we use two ropes that both carry the load, rather than one working rope and one slack back-up. If either rope, anchor or device fails, the other already holds everything, so there is no sudden drop.
  • Lowers. The stretcher and its attendant are lowered under control, with friction devices that stop the load if the operator lets go.
  • Raises. Pulleys and rope grabs create mechanical advantage, such as a 3:1 system, so a small team can haul a stretcher back up safely.
  • Edge management. Edge protectors stop ropes being cut or worn, and team members at the edge guide the ropes and stretcher over.
  • Anchors. Several anchor points are linked so the load is shared and no single point is relied on.
  • Fall restraint. Anyone working near the edge is clipped in so they cannot reach a point where they could fall.
  • Checks. Every system is checked from anchor to load, by someone who didn’t build it, before it is used.